Long Span Concrete-Arch-Bridges
Structural System: Inclined Leg Frame

Cross Sections: Legs with U-Cross Section; Deck with Box Cross Section.

Construction Sequences:

  • Access Viaducts and fabrication of the steel scaffolding
  • Assembly of the scaffolding (from the access viaduct) in upright position
  • Rotation of the scaffolding in the final position
  • Concrete casting of a first layer of the lower slab of the cross sections (strengthening of the scaffolding for axial force)
  • Concrete casting of the webs of the cross sections (strengthening of the scaffolding for bending forces)
  • Concrete casting of the second layer of the lower slab of the cross section
  • Construction of the deck girder over the frame.